Bossong Engineering
MENUMENU
  • Home
  • About
    • Our Story
    • History and Timeline
    • Careers
    • OH&S
  • Industries
    • Industries

    • Oil & Gas
    • Mining
    • Transport
    • Infrastructure
    • Construction
    • Utilities
    • Defence
  • Services
    • Services

    • Engineering
    • Robotic Welding
    • Machining
    • Manual Fabrication
    • Mobile Bucking Unit
    • Collar Guidance Device
    • Drill Pipe Hardbanding
    • Plasma Transferred Arc
    • Stabiliser Repairs
    • Hardfacing
    • Fitting
    • Filters
    • Pump Shaft Sleeves
    • Storage
  • News
  • Quality
  • Locations
    • Perth
    • Broome
    • Karratha
  • Contact
  • Click to open the search input field Click to open the search input field Search
  • Menu Menu
You are here: Home1 / News2 / solar power

Tag Archive for: solar power

Infrastructure

Solar power station

Bossong Engineering has taken further steps to minimize any negative impacts on the environment by installing a 150kW solar system to the roof of their Welshpool factory, and have been signed off as a power station by Western Power.

Because of the solar array assembled on the roof of the Welshpool factory, Bossong Engineering are able to uphold their corporate responsibility as an environmentally conscious company by greatly reducing the amount of electricity sourced from non-renewable sources.

 

30/11/2015
https://www.bossong.com.au/wp-content/uploads/solar.jpg 370 900 Bossong Admin /wp-content/uploads/Bossong-logo.png Bossong Admin2015-11-30 12:59:512017-08-16 15:39:11Solar power station
Oil & Gas

Solar Panel Installation

Bossong Engineering’s progression towards creating a carbon-neutral company has been significantly influenced by the recent installation of Solar Panels on the roof of the factory.

The 180kW Solar Power system will supply around 43% of the electricity required to run the company’s manufacturing operations. The system will meet around 270MWh per annum of the company’s electricity requirements and reduce the amount of electricity that needs to be imported from the grid by a corresponding amount.

The Solar Panels will also provide 20 year lifetime emission reductions of around 4400 tonnes of CO2 for the company itself, a significant step in terms of carbon-footprint reductions.

07/08/2014
https://www.bossong.com.au/wp-content/uploads/solar.jpg 370 900 Bossong Admin /wp-content/uploads/Bossong-logo.png Bossong Admin2014-08-07 10:39:092017-08-16 15:39:25Solar Panel Installation

Recent posts

  • Mazak Nexus 550M Oilfield Lathe
  • Coarse Ore Stockpile Chutes
  • Coarse Ore Stockpile Chutes
  • 3D Scanning
  • Weld Branding
  • Machining
  • Robotic Laser Scan Welding

Categories

  • Construction (2)
  • Defence (4)
  • Infrastructure (4)
  • Mining (8)
  • News (5)
  • Oil & Gas (29)
  • Transport (1)
  • Utilities (2)

Quick Link

  • About
  • Industries
  • Quality
  • News
  • Locations

Services

  • Engineering
  • Robotic Welding
  • Machining
  • Manual Fabrication
  • Mobile Bucking Unit
  • Collar Guidance Device
  • Drill Pipe Hardbanding
  • Plasma Transferred Arc
  • Stabiliser Repairs
  • Hardfacing
  • Fitting
  • Filters
  • Pump Shaft Sleeves

Contact us

  • 189 Planet Street
    Welshpool WA 6106
  • Phone: (08) 9212 2345
  • sales@bossong.com.au
  • Linkedin
Copyright 2025 Bossong Pty ltd. All Rights Reserved - powered by Enfold WordPress Theme
  • Sitemap
  • ACN 009337508
  • ABN 14009337508
  • Site by Cafe Media
Scroll to top Scroll to top Scroll to top