Bossong Engineering
MENUMENU
  • Home
  • About
    • Our Story
    • History and Timeline
    • Careers
    • OH&S
  • Industries
    • Industries

    • Oil & Gas
    • Mining
    • Transport
    • Infrastructure
    • Construction
    • Utilities
    • Defence
  • Services
    • Services

    • Engineering
    • Robotic Welding
    • Machining
    • Manual Fabrication
    • Mobile Bucking Unit
    • Collar Guidance Device
    • Drill Pipe Hardbanding
    • Plasma Transferred Arc
    • Stabiliser Repairs
    • Hardfacing
    • Fitting
    • Filters
    • Pump Shaft Sleeves
    • Storage
  • News
  • Quality
  • Locations
    • Perth
    • Broome
    • Karratha
  • Contact
  • Click to open the search input field Click to open the search input field Search
  • Menu Menu
You are here: Home1 / News2 / Infrastructure3 / Solar power station
Infrastructure

Solar power station

Bossong Engineering has taken further steps to minimize any negative impacts on the environment by installing a 150kW solar system to the roof of their Welshpool factory, and have been signed off as a power station by Western Power.

Because of the solar array assembled on the roof of the Welshpool factory, Bossong Engineering are able to uphold their corporate responsibility as an environmentally conscious company by greatly reducing the amount of electricity sourced from non-renewable sources.

 

30/11/2015
Tags: solar power
Share this entry
  • Share on Facebook
  • Share on X
  • Share on LinkedIn
  • Share by Mail
https://www.bossong.com.au/wp-content/uploads/solar.jpg 370 900 Bossong Admin /wp-content/uploads/Bossong-logo.png Bossong Admin2015-11-30 12:59:512017-08-16 15:39:11Solar power station
You might also like
Solar Panel Installation

Recent posts

  • Mazak Nexus 550M Oilfield Lathe
  • Coarse Ore Stockpile Chutes
  • Coarse Ore Stockpile Chutes
  • 3D Scanning
  • Weld Branding
  • Machining
  • Robotic Laser Scan Welding

Categories

  • Construction (2)
  • Defence (4)
  • Infrastructure (4)
  • Mining (8)
  • News (5)
  • Oil & Gas (29)
  • Transport (1)
  • Utilities (2)

Quick Link

  • About
  • Industries
  • Quality
  • News
  • Locations

Services

  • Engineering
  • Robotic Welding
  • Machining
  • Manual Fabrication
  • Mobile Bucking Unit
  • Collar Guidance Device
  • Drill Pipe Hardbanding
  • Plasma Transferred Arc
  • Stabiliser Repairs
  • Hardfacing
  • Fitting
  • Filters
  • Pump Shaft Sleeves

Contact us

  • 189 Planet Street
    Welshpool WA 6106
  • Phone: (08) 9212 2345
  • sales@bossong.com.au
  • Linkedin
Copyright 2025 Bossong Pty ltd. All Rights Reserved - powered by Enfold WordPress Theme
  • Sitemap
  • ACN 009337508
  • ABN 14009337508
  • Site by Cafe Media
Link to: New Connection Licences Link to: New Connection Licences New Connection LicencesVAM-logo Link to: Robotic Laser Scan Welding Link to: Robotic Laser Scan Welding Robotic Laser Scan Welding
Scroll to top Scroll to top Scroll to top