Bossong Engineering
MENUMENU
  • Home
  • About
    • Our Story
    • History and Timeline
    • Careers
    • OH&S
  • Industries
    • Industries

    • Oil & Gas
    • Mining
    • Transport
    • Infrastructure
    • Construction
    • Utilities
    • Defence
  • Services
    • Services

    • Engineering
    • Robotic Welding
    • Machining
    • Manual Fabrication
    • Mobile Bucking Unit
    • Collar Guidance Device
    • Drill Pipe Hardbanding
    • Plasma Transferred Arc
    • Stabiliser Repairs
    • Hardfacing
    • Fitting
    • Filters
    • Pump Shaft Sleeves
    • Storage
  • News
  • Quality
  • Locations
    • Perth
    • Broome
    • Karratha
  • Contact
  • Click to open the search input field Click to open the search input field Search
  • Menu Menu
You are here: Home1 / News2 / 20113 / January
Oil & Gas

Drill Pipe Hardbanding

Bossong Engineering continues to expand its range of premium services that is capable of providing to the Oil and Gas industry with the successful development of drill pipe hardbanding. The hardbanding process has been highly successful with turn around times exceeding expectations. The business has unique robotic capabilities which creates a precise, consistent and premium quality weld that meets all customer specifications and requirements and ensures a casing friendly surface finish. Bossong has an extensive range of hard banding products that it is capable of applying which includes:

  • Arnco 100XT™
  • Arnco 150XT™
  • Arnco 300XT™
  • Durmat NI2 Plus
  • Durmat AS-760
  • Other applications can be tailored to clients requirements

The advantage of Hardbanding is that it protects and extends the life of costly drill pipe and tool joint material from the wear associated with rotational and axial friction forces while drilling and tripping in and out of a well.

[nggallery id=6]

19/01/2011
https://www.bossong.com.au/wp-content/uploads/IMG_76951.jpg 533 800 Bossong Admin /wp-content/uploads/Bossong-logo.png Bossong Admin2011-01-19 13:17:452017-08-07 15:30:38Drill Pipe Hardbanding
Oil & Gas

Cargo Basket production

The Drill Rod Cargo Baskets have begun production with the experienced team of fabricators at Bossong Engineering making the design concept reality. Over the coming weeks production will continue with phases of development further illustrated as progress occurs.

10/01/2011
https://www.bossong.com.au/wp-content/uploads/IMG_7680.jpg 683 1024 Bossong Admin /wp-content/uploads/Bossong-logo.png Bossong Admin2011-01-10 10:49:542017-08-07 15:32:48Cargo Basket production

Recent posts

  • Mazak Nexus 550M Oilfield Lathe
  • Coarse Ore Stockpile Chutes
  • Coarse Ore Stockpile Chutes
  • 3D Scanning
  • Weld Branding
  • Machining
  • Robotic Laser Scan Welding

Categories

  • Construction (2)
  • Defence (4)
  • Infrastructure (4)
  • Mining (8)
  • News (5)
  • Oil & Gas (29)
  • Transport (1)
  • Utilities (2)

Quick Link

  • About
  • Industries
  • Quality
  • News
  • Locations

Services

  • Engineering
  • Robotic Welding
  • Machining
  • Manual Fabrication
  • Mobile Bucking Unit
  • Collar Guidance Device
  • Drill Pipe Hardbanding
  • Plasma Transferred Arc
  • Stabiliser Repairs
  • Hardfacing
  • Fitting
  • Filters
  • Pump Shaft Sleeves

Contact us

  • 189 Planet Street
    Welshpool WA 6106
  • Phone: (08) 9212 2345
  • sales@bossong.com.au
  • Linkedin
Copyright 2025 Bossong Pty ltd. All Rights Reserved - powered by Enfold WordPress Theme
  • Sitemap
  • ACN 009337508
  • ABN 14009337508
  • Site by Cafe Media
Scroll to top Scroll to top Scroll to top