Workshop Extension Progress
Bossong Engineering is thrilled to announce that the workshop extension which will add an extra 700m2 to the original building is almost complete. The extension has been added to create space for the Mazak Nexus 400-II Oilfield Lathe and Phosphate tanks where Bossong Engineering will now be able to offer customers the full range of services for drill pipe including hard banding, thread cutting and soon phosphating to add to the list. Our cold rolling for non magnetic oilfield connections is expected in the next couple of weeks.