, ,

Coarse Ore Stockpile Chutes

Iron ore is the highest volume mined commodity in Western Australia and accounted for 82 per cent of the mineral exports in 2021.

It is highly abrasive and wear to all infrastructure in the mining and processing supply chain is a common problem.

That’s where we come in, Bossong Engineering have been supplying Australian mine sites with wear solutions since 1988. Our multifaceted business allows us to work with our clients right from the design phase through to delivery, and everything in between, offering bespoke solutions. 

In this instance the team delivered two 57T and two 45T chutes just months apart to a loyal customer based in the Pilbara. The scope was to develop a fabrication drawing set for a replacement chute, including design of transport and lifting frames, fabrication to a tight tolerance and transport to site. This allowed for the chute to be replaced in a matter of days minimising downtime on site.   

Our clients know that Bossong Engineering’s quality surpasses expectation with an experienced team on the job.

If you need a complex solution delivered on time and on budget contact the Bossong Engineering team here.