Mobile Bucking Unit

Bossong Engineering are now equipped with a Mobile Bucking Unit.

The Bucking Unit is a NOV BOWEN 821 with Compu-torque system to monitor, control and record bucking process.

Sizing capabilities range from 2 3/8″ to 17″

Maximum Torque reaches 75000 lb/ft

The unit works by hydraulic motors driving the pipe in and out of the unit. Make up graphs can be provided for all connection types. A crane can be used for setup to minimise reliance on forklifts. A minimum of 1 day is required for setup and installation of the unit. Demobilisation requires minimum 0.5 days.

Running the unit is a 2 man operation (Forklift operator required). The unit is designed to be ‘hands-free’ for safe operation. Make-up rate of 40-60 connections per day. Break-out rate of 80-100 connections per day.

It is a Self Sufficient Unit. Generators are hired near site and runs all systems.

SOP’s, JSA’s, Unit layout and footprint are all available.

, ,

Mazak Nexus 550M Oilfield Lathe

Bossong Engineering have enhanced their capabilites once again with the introduction of the Mazak Nexus 550M Oilfield Lathe. With the capacity to provide milling services, mulit-operational components are now able to be done in a single setup, improving lead times and most importantly improving the quality and accuracy of the finished product.

With the acquisition of the Broome Facility and the Mazak Nexus 550M to meet customer demands, Bossong Engineering are now the largest Oilfield Tubular Machining/Welding workshop in Western Australia, comprising a total of 6 Oilfield Lathes.

, ,

Broome Facility

Bossong has recently expanded its operations to Broome to better service our oil and gas customers. The facility is 6000sqm and has a 1000sqm shed and caretaker residence.

The Broome facility operates 2 CNC oilfield lathes and offers connections repairs, hard banding, bucking services, wash down and inspection bay as well as storage capabilities.

26 McDaniel Road Minyirr WA 6725

Solar Panel Installation

Bossong Engineering’s progression towards creating a carbon-neutral company has been significantly influenced by the recent installation of Solar Panels on the roof of the factory.

The 180kW Solar Power system will supply around 43% of the electricity required to run the company’s manufacturing operations. The system will meet around 270MWh per annum of the company’s electricity requirements and reduce the amount of electricity that needs to be imported from the grid by a corresponding amount.

The Solar Panels will also provide 20 year lifetime emission reductions of around 4400 tonnes of CO2 for the company itself, a significant step in terms of carbon-footprint reductions.

Quality Management System – Customer Audits

Over the past 6 months, Bossong Engineering have welcomed have welcomed 3 of our prime customer on-site to undertaken 2nd Party QMS (Quality Management System) Audits.

We are very pleased to confirm that from the three full day QMS audits conducted, zero non-conformances we identified, with Bossong Engineering recieving an overall ranking of 98% from one customer and a commendation from a second.

However, at Bossong Engineering we are more than aware that the continual improvement of the Quality Management System is an on-going process and are determined to continue to improve, always striving to meet and exceed the expectations of our clients.